SCM08 / SCM12
Caps scoring system
Closure bridges can be made either directly into the mould during the cap forming phase, or by slitting process in a post molding stage. The possibility of changing the slitting configuration (number of bridges, thickness of bridges, etc..) has an impact, amongst others, on flexibility and on bridges breaking force, thus fulfilling end users requirements